Serenity MQZDV1917 Instruções de Operação Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 50
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
Facing Material Installation Guide
The entire Facing Material for this unit may either be of combustible or non-combustible material. It
is recommended that the Facing be installed after the unit is secured in its framing and properly
vented. A cutout profile for this unit is shown in the Dimensional Overview section.
NOTE: Only one 2x4 stud/header may be used in the frame. Please refer to Figure 5 on page
10 or Figure 11 below.
To ensure the Front Surround covers the maximum area of the cutout, it is recommended that the
upper corners of the cutout be rounded with a 1” to 2” [25.4mm to 50.8mm] radius. This is shown
in Figure 12.
Figure 11 - Installation guide for 1/2" facing material.
Figure 12 - Recommended 1" to 2" radius on upper corner of facing material cutout.
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 49 50

Comentários a estes Manuais

Sem comentários